Hinckley Hospital CDC
Hinckley Hospital Community Diagnostic Centre
In July 2025, EvaBuild successfully completed the groundworks for the brand-new Hinckley Community Diagnostic Centre (CDC), working in partnership with our client Darwin Group. Commissioned by the NHS, this cutting-edge facility will provide approximately 80,000 additional diagnostic tests annually for patients across Hinckley and the wider Leicestershire area.
The CDC was officially opened on 27th June 2025 by Dr Luke Evans, MP for Hinckley and Bosworth. Operating seven days a week, the centre forms part of the NHS's broader programme to enhance diagnostic services through more accessible, community-based facilities.
Modern Methods of Construction (MMC)
Hinckley CDC was constructed using Modern Methods of Construction (MMC), allowing for the Darwin Group's modular units to be assembled concurrently with our groundworks. This collaborative and streamlined approach significantly reduced project timelines, enabled earlier occupation and minimised disruption on site.
Scope of Works
EvaBuild was responsible for all groundworks and enabling works on site. Our scope included:
Site Preparation & Investigation:
Desktop utilities search
Topographical and utility surveys
CCTV drainage inspection
Trial pits and concrete cube testing for foundations and plinths
Asbestos and demolition surveys
Demolition & Enabling Works:
Demolition of existing units
Removal of trees, fencing, and existing access ramp
Groundworks & Foundations:
Reduced-level dig to building footprint
Installation of pad foundations (reinforced and unreinforced), strip foundations, and PPC piers
Construction of permanent sheet piled retaining wall
Service Trenches:
Water, electric, data/alarm, and gas service trenches installed to specification
Drainage:
Surface water drainage system with SuDS attenuation tank (up to 140m³)
Foul water drainage
External Works:
Construction of a new tarmac access area with 150mm stone sub-base
Kerb installation
Bases constructed for fuel tank, generator, and substation
Line marking
Landscaping & Finishes:
Soft landscaping with topsoil and grass seeding
Decorative gravel areas beneath new access ramps
This project is a strong example of EvaBuild’s ability to deliver complex groundworks within tight timeframes, ensuring seamless integration with modular construction methods. We’re proud to have supported Darwin Group and the NHS in delivering a facility that will have a lasting impact on local healthcare provision.