Hinckley hospital

Hinckley Hospital CDC

Hinckley Hospital Community Diagnostic Centre  

In July 2025, EvaBuild successfully completed the groundworks for the brand-new Hinckley Community Diagnostic Centre (CDC), working in partnership with our client Darwin Group. Commissioned by the NHS, this cutting-edge facility will provide approximately 80,000 additional diagnostic tests annually for patients across Hinckley and the wider Leicestershire area. 

The CDC was officially opened on 27th June 2025 by Dr Luke Evans, MP for Hinckley and Bosworth. Operating seven days a week, the centre forms part of the NHS's broader programme to enhance diagnostic services through more accessible, community-based facilities. 

Modern Methods of Construction (MMC) 

Hinckley CDC was constructed using Modern Methods of Construction (MMC), allowing for the Darwin Group's modular units to be assembled concurrently with our groundworks. This collaborative and streamlined approach significantly reduced project timelines, enabled earlier occupation and minimised disruption on site. 

Scope of Works 

EvaBuild was responsible for all groundworks and enabling works on site. Our scope included: 

Site Preparation & Investigation: 

Desktop utilities search 

Topographical and utility surveys 

CCTV drainage inspection 

Trial pits and concrete cube testing for foundations and plinths 

Asbestos and demolition surveys 

Demolition & Enabling Works: 

Demolition of existing units 

Removal of trees, fencing, and existing access ramp 

Groundworks & Foundations: 

Reduced-level dig to building footprint 

Installation of pad foundations (reinforced and unreinforced), strip foundations, and PPC piers 

Construction of permanent sheet piled retaining wall 

Service Trenches: 

Water, electric, data/alarm, and gas service trenches installed to specification 

Drainage: 

Surface water drainage system with SuDS attenuation tank (up to 140m³) 

Foul water drainage 

External Works: 

Construction of a new tarmac access area with 150mm stone sub-base 

Kerb installation 

Bases constructed for fuel tank, generator, and substation 

Line marking 

Landscaping & Finishes: 

Soft landscaping with topsoil and grass seeding 

Decorative gravel areas beneath new access ramps 

This project is a strong example of EvaBuild’s ability to deliver complex groundworks within tight timeframes, ensuring seamless integration with modular construction methods. We’re proud to have supported Darwin Group and the NHS in delivering a facility that will have a lasting impact on local healthcare provision. 