Swansea University

Job Details:

Project Length – 20 Weeks
Completed on time
Contract value: £100K – £250K
Completion date: May 2018

The Project

New two storey building for Swansea SPECIFIC ‘The Active Office’ is the UK’s first energy positive office.

Works included, extensive reduce dig of stockpiled material from previous developments, SW and FW drainage diversions around proposed new building footprint.

Shallow pad foundations with lintels spanning between each to support new brickwork skirt constructed by EvaBuild. Stepped detail to accommodate dual level building. SW and FW connected back into existing systems on site. Extensive service trench through campus back to existing plant room.

Extension of existing conservation paving up to new building. Re-grading stockpiled material around building ready for others to plant wild flowers.

Client Feedback

“A big thank you to all that  worked on the Specific Building at Swansea University Bay Campus! We were delighted with the building and that we had completed it in such a short period of time.If it wasn’t for all the hard work of our Sub Contractors, this time scale and the high standard of the building would not be possible”