Longfield Primary School

Job details

Project Length: 20 Weeks
Completed on time
Contract value: £250K – £500K
Completion Date: June 2016

The project

Difficult access via long run of HD track way and heras fencing across school field supplied by EvaBuild. Extensive earthworks as a result of large building and new hardstanding area carefully managed by EvaBuild during school term.

Shallow strip and pad foundations were possible including local FW connection and soakaway to service SW drains. Capacity of existing foul pumping chamber was checked and found to be capable of accepting flow of new building. Existing pumps were replaced with new larger macerator units with a new larger rising main with outfall into public sewer. Designs, applications and work all carried out by EvaBuild.

Brickwork skirt detail with plinth brick headers constructed in-house by EvaBuild.

Extensive hard landscaping package to include new porous tarmac paving area, tarmac paths around building, cycle shelter base and unit, car park extension with fire tender access.

Client feedback

“EvaBuild were fantastic. They worked around the school’s needs, ensuring as little disruption to the everyday running of the school as possible. We highly recommend EvaBuild [for] any future projects like this.”

 